Framed & Stitched Up

The trusty (and steadily growing) team of SRC volunteers has been busy cracking on with NER No.2051, a diagram 15 five compartment third. There is a steady routine of the ‘2051 gang’ getting together every Thursday (and often Wednesdays as well) and they go home each week feeling that the coach is that bit further forward. They really have the bit between their teeth!

The images from this week probably don’t look much different from a fortnight ago but the devil, or delight, is in the detail. With the lower panelling removed the few problem areas of the frame have been exposed and the team have been busy either stitching up splits (glue and screw) or else splicing in fresh bits of wood to replace rotten sections. Further to previous posts, we will do almost all of the work in house with the exception of one corner post which one of the volunteers will fund a specialist joiner to sort out. 

It is hoped that the frame will be completed this month and in the next week or so we will be applying the first coat of specialist primer to areas previously coated in bitumen. By doing that sooner rather than later the team have plenty of time to assess how the primer reacts to the wood before we go any further. There’s still a lot of work to do, especially on the doors and underframe, but the fitting of new lower panels isn’t that far off and that visual sign of progress will be fantastic to see.

Comments

Popular posts from this blog

An Illuminating Find!

Firstly, for those who are new to what we do at Kirkby Stephen East, North Eastern Railway stores van No.2 is an important part of the collection at KSE. It is owned by the Locomotive Conservation and Learning Trust (LCLT). The van was rescued by Beamish Museum in 1973. A decision was taken by Beamish Museum to de-accession the vehicle from its collection and dispose of it. This was in 2013. The van was offered to the LCLT. After inspection of the van the LCLT agreed to assume ownership. It was transported to KSE in 2014. It restoration, helped with funds from a National Lottery Heritage Fund award, began in late autumn 2018 and is now largely complete. Completion of some minor interior jobs is in hand. Externally there is a roof job to complete that will be tackled when scaffolding has been erected in the shed. One feature of the van that had been proving difficult to deal with was the reproduction of the fitted sidelights. The van carried sidelights because in addition to the deliver...

Keeping On The Boil

One of the many myths about the J21 (sorry, Class C) was that it needed a new boiler. It doesn’t, but the existing one has needed a lot of time, work and money to get ready for steaming. Great progress has been made with this and the image shows the left-hand side of the boiler and the general arrangement, with the assembly now prepared and ready for riveting. With the new backhead and foundation ring fitted, and the outer wrapper nearing completion, the boiler / firebox assembly is now coming together.  Needless to say, concurrent with this final push to construct the locomotive there is a sprint to raise the last of the necessary funding to top up the huge generosity of the National Lottery Heritage Fund; without which this restoration could never have happened. Please join our 876 Club or indeed any of the support schemes tailored for every pocket.

Rolling Stock Roundup - NER Passenger Vehicles

As this is a fairly new blog, and some readers may not know about the goings-on at KSE, we've put together something to bring you all up to speed. As there's rather a lot, we'll start with the North Eastern Railway (NER) passenger vehicles:  N.E.R 6-Wheelers Amongst the collection at KSE is a cohort of NER 6-wheeled coaches, that we hope will pair perfecrly with NER C class No.876:            131 One of several important vehicles for the NER microcosm at KSE is NER Passenger Brake No.131. Not only will it form part of the appropriate Timeless Trains passenger rake, it will also join Stores Van No.2 in a stores train. For this update, we see the main frame repairs, including the bottom rails, almost complete and, with the body now lowered down on to the chassis, correctly aligned and secured in place, attention has turned to installing the new floor. As can be seen in the attached photo, this stage of the work is also approaching completion an...