For readers who are not familiar with the NER vehicles in the collection at Kirkby Stephen East this post will begin with a little history.
The North Eastern Railway supplied its stations and depots with all of the day to day necessities needed for the successful running of its business by running stores trains. These trains were made up of several vans. They worked from the NER stores department at Greensfield Junction, Gateshead running to timetables designed to serve all of the NER system.
We have an example of a stores van in the collection at KSE. It is a diagram H2 van. The surviving example of the two that were completed at York works in 1902. The number it carries is 2. At this point you probably imagine that if we have van 2 of the two that were built, then the other must have been van 1. In fact, the other diagram H2 stores van was numbered 5523, and for a while this was the van we thought we had. Thorough research supported with evidence from photos enabled us to confirm our van's correct identity.
![]() |
| Van 2 outside during the S&DR 200 gala |
Vans 2 and 5523 survived in use on the railway until 1962 when they were withdrawn. On withdrawal both vans were sold to John Dickinson transport, a coal and general haulage contractor based at Winston station on the Stainmore route. Here we assume the vans were used by the company as storage space. In 1973 van 2, in a somewhat derelict state and some doors from van 5523 were obtained by the then under development Beamish Museum. The van was removed to the museum site, made weatherproof but had no restoration work completed.
At one point in the 1980s an arson attack at Beamish saw van 2 damaged. Beamish Museum decided to de-accession the van and donate it to the Locomotive Conservation and Learning Trust. The van was delivered to KSE in 2014. It was given some essential maintenance to its brakes and running gear, made secure and put into store pending the outcome of a bid for funds from the National Lottery Heritage Fund to restore the van together with NER C class 0-6-0 876 which later became LNER J21 5033 and finally BR J21 65033. After much hard work led by Mike Thompson a large award was made to allow this work to proceed. In addition to funds from the lottery the van was allocated £20,000 from the PRISM fund that was run by the Science Museum at that time.
Restoration of van 2 commenced in the autumn of 2018. The work was aided by the survival of two superbly detailed NER general arrangement drawings that were in the Railway Museum collection at York. By the summer of 2024 the van's restoration was largely, but not entirely, complete.
The roof was missing an important structure that we had struggled to understand despite the existence of the drawings. Eventually we determined what the drawings described and we have now completed construction of a replica. This structure is described as a roof slide. It covered an aperture in the roof that accepted the hoses for filling the oil and paraffin tanks located at one end of the van. The slide was designed to move from side to side allowing just over half of the aperture to be exposed. The slide was deliberately designed to function as a single piece to make it as weatherproof as possible. Two sections meeting at the centre would create a gap where they abutted. The gap would be small but not weatherproof. We have speculated on how some of the structure was constructed.
The sliding section was retained on the roof by two runners. Clearances are shown in the form of dotted lines on the drawings, but if the parts were made according to the dimensions shown you could not create a freely moving structure. We also do not understand how the slide retained its curved shape to allow it to travel in the runners. Because of these matters and the fact that we did not wish to have an opening in the roof we have made a none working representation of the roof slide having the correct size and appearance and which finishes the roof mounted structures.
Each of the runners in our reproduction is made up from two sections of timber screwed together and screwed onto the roof. This manner of construction enable us to follow the curve of the roof more easily. Boards forming the roof of the slide were screwed to its supports that had also be made up from two sections of timber of a size that would also follow the curve of the roof, but when assembled have the dimensions shown on the drawing. The whole structure was painted in primer. Once this was dry the canvas bonding was spread onto the boards forming the roof of slide after which canvas was applied. The canvas was secured at the edges with clout nails which were then covered with half round mouldings. The use of half round mouldings to create a neat clean finish when canvas is applied to the roof of a vehicle is typical NER practice and is present on other NER vehicles at KSE. The mouldings we have used have been recovered from a scrap vehicle and thus have railway provenance.
The final job was painting. It has been a while since the roof was first painted and once painted the roof slide would stand out and look quite wrong. The rest of the roof canvas has been cleaned and the whole of the roof repainted. We are pleased with the outcome.
| The complete sliding door replica |
The roof slide is adjacent to the loading doors. There are rainstrips above these doors. We made these too long. If the roof slide was functional it would strike the rainstrips. The rainstrips have been taken off, cut to the correct length and refitted. Touching up the paint will complete the job.